Point Of Contact Not Available
The project includes the construction of FRP wet well, submersible pumps, valve vault, manholes, 8 and 12-inch gravity wastewater line, 12-inch force main, cast-in place concrete structures, concrete pavement, odor control unit, electrical systems, diesel emergency generator, lighting, miscellaneous related items, fencing, gates, pavement repair, traffic control and all other associated appurtenances.
Bid Protests Not Available