The project includes the construction of approximately 56,174 linear feet of 8, 12, 15, 18, 30, and 36-inch gravity wastewater line, 8 and 12-inch force main, 8, 10, 12 and 14-inch siphon pipe, steel casing (varying sizes), two pipe bridges, manholes, gate valves, air valves, abandonment work of five existing lift stations, cast-in place concrete structures, pavement repair, system connections, erosion controls, fencing, gates, pavement repair, roadway bores, traffic control and all other associated appurtenances.