Construct an Airfield Flight Control Tower with an aviation operations building. Project includes special foundations, building information systems, connections to energy monitoring and control system, fire/smoke detection and alarm systems and connections to the installation central systems. Fire suppression systems will be provided. Supporting facilities include electric service, water, sewer and gas, paving, walks, curbs and gutters, parking, storm drainage, site work and information systems. Heating and air conditioning will be provided by self-contained systems. Access for individuals with disabilities will be provided. Antiterrorism measures include building setbacks and perimeter lighting. Air Conditioning (Estimated 2,603 Tons).
Bid Protests Not Available