This work includes placing R-7 riprap, and R-7 and R-8 rockfill along approximately 375 LF of the left bank of Salt Lick creek at the Ross and Philips properties in Great Bend. In addition to securing right-of-ways for access, the sponsors are responsible for removing all vehicles, trailers, etc. that block access to the top of bank prior to construction.
The magnitude of this projects is between $100,000 and $ 250,000.
The site showing information is 9:00AM on June 27, 2007 at the address listed on Page 32 under clause 52.236-27.
Central Contract Registration, Online Certifications and Representations, and direct deposit are required for this contract. A 20% bid bond is required.
Bid Protests Not Available