Stream stabilization projects: (DSR CO 06-011). This project consists of one reach along Fishing Creek and four reaches along an unnamed tributary to the Fishing Creek in Orange Township.
PLANS AND SPECIFICATIONS ARE TO BE OBTAINED FROM WWW.FBO.GOV
? Reach 1, along Fishing Creek, will involve installation of 200+/- feet of R-8 Rockfill on the right stream bank, installation of 500+/- access road, and stream barbs. The R-8 Rockfill will be installed at the toe of existing riprap.
PLANS AND SPECIFICATIONS ARE TO BE OBTAINED FROM WWW.FBO.GOV
? Reach 2, between the Paden and Frederick properties, will involve deposition removal in the stream bed of an unnamed tributary to Fishing Creek, at the locations flagged by the COR, to match the existing bed grade up and downstream, and the installation of 152+/- feet of Pre-cast Concrete Modular Block Wall along the left stream bank ending at the Frederick house.
PLANS AND SPECIFICATIONS ARE TO BE OBTAINED FROM WWW.FBO.GOV
? Reach 3, along the Groshek property, will involve deposition removal in the stream bed of an unnamed tributary to Fishing Creek, at the locations flagged by the COR, to match the existing bed grade up and downstream, installation of 120+/- feet of stacked rock with compacted backfill along the left stream bank starting at the driveway culvert and the installation of an additional 40+/- feet of R-7 riprap on the left bank.
PLANS AND SPECIFICATIONS ARE TO BE OBTAINED FROM WWW.FBO.GOV
? Reach 4, along the Derrick property, will involve installation of 250+/- feet of R-6 riprap along the right stream bank tying into 60+/- feet of Pre-cast Concrete Modular Block Wall along the backside of the business.
PLANS AND SPECIFICATIONS ARE TO BE OBTAINED FROM WWW.FBO.GOV
? Reach 5, along the Hopper property, will involve installation of 60+/- feet of R-7 riprap on the right stream bank with compacted backfill tying into a hand placed stone wall and 72+/- feet of stacked rock installed downstream of the driveway culvert.
PLANS AND SPECIFICATIONS ARE TO BE OBTAINED FROM WWW.FBO.GOV
Stream flow diversion and dewatering as necessary.
PLANS AND SPECIFICATIONS ARE TO BE OBTAINED FROM WWW.FBO.GOV
The magnitude of this projects is between $ 100,000 and $ 250,000.
PLANS AND SPECIFICATIONS ARE TO BE OBTAINED FROM WWW.FBO.GOV
The site showing information is published on Page 31 of the Provisions and Clauses.
PLANS AND SPECIFICATIONS ARE TO BE OBTAINED FROM WWW.FBO.GOV
Central Contract Registration, Online Certifications and Representations, and direct deposit are required for this contract. A 20% bid bond on Standard Form 24 is required.
PLANS AND SPECIFICATIONS ARE TO BE OBTAINED FROM WWW.FBO.GOV
The rip rap size to use on this project is the size specified on the rip rap specification. All other references to size are to be disregarded.