SMALL BUSINESS COMPETIVENESS DEMONSTRATION PROGRAM ACQUISITION.
PLANS AND OTHER MATERIALS ARE TO BE OBTAINED FROM WWW.FBO.GOV.
Stream stabilization projects: (DSR CO-06-010).
This project consists of two reaches along Stoney Brook and an unnamed tributary in Orange Township.
? Reach 1, along the Lanzafame property, will involve deposition removal in the stream bed of Stoney Brook, at the locations flagged by the COR, to match the existing bed grade up and downstream, installation of 280+/- feet of stacked rock with compacted backfill along the left stream bank starting at an existing concrete flume and tying into existing concrete wall and then continuing upstream.
? Reach 2, along the Lytle property, will involve installation of 135+/- feet of R-7 riprap on the right stream bank of Stoney Brook and 150+/- feet of Pre-cast Concrete Modular Block Wall installed upstream of the driveway bridge on the left bank of an unnamed tributary to Stoney Brook.
Stream flow diversion and dewatering as necessary.
The magnitude of this projects is between $25,000 and $100,000.
The site showing information is published on Page 31 of the Provisions and Clauses.
Central Contract Registration, Online Certifications and Representations, and direct deposit are required for this contract. A 20% bid bond on Standard Form 24 is required.
The rip rap size to use on this project is the size specified on the rip rap specification. All other references to size are to be disregarded.
PLANS AND OTHER MATERIALS ARE TO BE OBTAINED FROM WWW.FBO.GOV
Bid Protests Not Available