*** NOTICE TO REPUBLISHERS OF THIS INFORMATION. PLEASE REFER YOUR CUSTOMERS TO WWW.FBO.GOV FOR PLANS, SPECIFICATIONS, AND BID MATERIALS.
THE POINT OF CONTACT SHOULD ONLY BE CONTACTED AFTER A REVIEW OF THE DOCUMENTS ON WWW.FBO.GOV.
THESE PROJECTS ARE LOCATED PRIMARILY IN NORTHEASTERN PA. NONE ARE IN DAUPHIN COUNTY (HARRISBURG.) ***
SMALL BUSINESS COMPETIVENESS DEMONSTRATION PROGRAM ACQUISITION
Stream stabilization projects: (DSR MO 06-007 ). Remove damaged gabion baskets from approximately 200? of the right bank of Fritz Run. Remove concrete blocks, concrete slabs, and other debris from this area. Regrade the disturbed stream bank, bringing in necessary unclassified fill. Compact the stream banks before installing R-7 riprap. See attached specifications and drawings for specifics.
The magnitude of this projects is between $25,000 and $100,000.
The site showing information is published on Page 32 of the Provisions and Clauses.
Central Contract Registration, Online Certifications and Representations, and direct deposit are required for this contract. A 20% bid bond on Standard Form 24 is required.
Bid Protests Not Available