EMERGING SMALL BUSINESS SET ASIDE (FAR 19.1007(C))
Stream stabilization projects: (DSR SU 06-020 ) This work includes placing R-7 riprap along approximately 95 LF of the left bank of the Dunaff Creek Creek, upstream and downstream of Route 106 in Clifford. See attached specifications and drawings for specifics.
The magnitude of this projects is less than $25,000.
The site showing information is published on page 27 of the provisions and clauses.
Central Contract Registration, Online Certifications and Representations, and direct deposit are required for this contract.
ALL SOLICIATION MATERIALS ARE TO BE OBTAINED FROM WWW.FBO.GOV
Bid Protests Not Available