EMERGING SMALL BUSINESS SET ASIDE (FAR 19.1007(C))
Stream stabilization projects: (DSR SU 06-018 ) This project includes placing approximately 85 linear feet of R-8 dumped riprap on the left bank of the creek, behind the Birchardville Pine Shop.In addition, the gravel deposition in the creek in the same reach, shall be removed. A cluster of trees, which are leaning over the creek just upstream of Route 267, shall be cut and removed from the site. See attached design package for specifics.
The magnitude of this projects is less than $25,000.
The site showing information is published on page 27 of the Provisions and Clauses.
Central Contract Registration, Online Certifications and Representations, and direct deposit are required for this contract.
ALL SOLICIATION MATERIALS ARE TO BE OBTAINED FROM WWW.FBO.GOV
Bid Protests Not Available