Federal Bid

Last Updated on 04 Jan 2008 at 5 AM
Solicitation
Bradford Pennsylvania

Y -- EWP Pennsylvania

Solicitation ID AG2D37S080084
Posted Date 17 Oct 2007 at 4 AM
Archive Date 04 Jan 2008 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Pennsylvania State Office
Agency Department Of Agriculture
Location Bradford Pennsylvania United states 18848
*** NOTICE TO REPUBLISHERS OF THIS INFORMATION. PLEASE REFER YOUR CUSTOMERS TO WWW.FBO.GOV FOR PLANS, SPECIFICATIONS, AND BID MATERIALS. THE POINT OF CONTACT SHOULD ONLY BE CONTACTED AFTER A REVIEW OF THE DOCUMENTS ON WWW.FBO.GOV. THESE PROJECTS ARE LOCATED PRIMARILY IN NORTHEASTERN PA. NONE ARE IN DAUPHIN COUNTY (HARRISBURG.) *** SMALL BUSINESS COMPETIVENESS DEMONSTRATION PROGRAM ACQUISITION Stream stabilization projects: (DSR BR-06-002 & BR-06-007). See attached specifications and drawings for specifics. BR-06-02 (Westbrook): The purpose of this project is to stabilize approximately 265? of eroding bank along Satterlee Creek and adjacent to a business and home owned by Benny Westbrook. The stream bank will be excavated to achieve the required slopes for the R-6 riprap installation. It is the responsibility of the Contractor to secure a spoil area for excess material from the riprap toe excavation. BR-06-07 (Horton): The purpose of this project is to stabilize approximately 375? of eroding bank along Horn Brook and adjacent to a several buildings including a house, barn, and wool shop on property owned by Thomas Horton. The upstream section of riprap will extend beyond Mr. Horton?s property and necessary arrangements will be made with the adjacent landowner. A significant amount of gravel deposition will be removed from the streambed and will be used to meet the design slopes for the proposed riprap. A combination of excavation and fill will be necessary to achieve the required slopes for the R-8 riprap installed. Several fallen and unstable trees and other woody debris within the work area will need to be removed from the stream channel. It is the responsibility of the Contractor to secure a spoil area for excess material and debris. The magnitude of this projects is between $100,000 and $250,000. The site showing information is published on Page 32 of the Provisions and Clauses. Central Contract Registration, Online Certifications and Representations, and direct deposit are required for this contract. A 20% bid bond on Standard Form 24 is required. The rip rap size to use on this project is the size specified on the rip rap specification. All other references to size are to be disregarded.
Bid Protests Not Available

Similar Past Bids

Plymouth Pennsylvania 21 Aug 2007 at 4 AM
Catawissa Pennsylvania 31 Aug 2007 at 4 AM
Columbia Pennsylvania 31 Aug 2007 at 4 AM
Benton Pennsylvania 21 Aug 2007 at 4 AM
Carbondale Pennsylvania 21 Aug 2007 at 4 AM

Similar Opportunities