Furnish labor, equipment, supplies, and materials, necessary to construct a stock water development which will consist of upgrading an existing well, installing a pump control system, installing an approximately 60,000 gallon hypalon lined reservoir and installing an estimated 5.5 mile pipeline with stock tanks. Work is located in Valley County Montana. Contractor will furnish an estimated quantity of 1) 28720 linear feet of Trenching, Backfilling and Compacting-Common 2) 22500 linear feet of PVC Pipe, Class 160, 1 1/2 inch diameter 3) 4800 linear feet of PVC Pipe, Class 160, 2 inch diameter 4) 9 each 1 1/2 inch Curb Stop Valve Assembly 5) 5 each 2 inch Curb Stop Valve Assembly 6) 12 each 1 inch Curb Stop Valve Assembly with drain Assembly 7) 40 each Air Relief Valve Assembly 8) 12 each Watering Assembly 9) 12 each Water Trough Assembly 10) 1 each Installation of the Hypalon Storage Bag 11) 1 each Pumping Facility 12) 1 each Big Game/Cattle Exclosures. The contractor will have 100 days to complete the project after Notice to Proceed is issued. The project is estimated between $25,000 and $100,000. Awards over $25,000 require 100% Payment Protection in the form of an Irrevocable Letter of Credit, Certificate of Deposit or Payment Bond within 15 days of notification of award. The proposed award is 100% set aside for small business concerns. The solicitation will be available on August 1, 2003, at the web site at http://ideasec.nbc.gov. No hard copies will be sent.
Bid Protests Not Available