Federal Bid

Last Updated on 14 Feb 2020 at 4 AM
Solicitation
Bremerton Washington

YC-1591 & YC-1571 Maintenance

Solicitation ID N4523A20R1054
Posted Date 23 Jan 2020 at 6 PM
Archive Date 13 Feb 2020 at 5 AM
NAICS Category
Product Service Code
Set Aside Total Small Business (SBA) Set-Aside (FAR 19.5)
Contracting Office Puget Sound Naval Shipyard Imf
Agency Department Of Defense
Location Bremerton Washington United states 98314

Solicitation N4523A20R1054 is being updated after Request for Clarifications were received.  The updates include questions/answers to three (3) questions submitted, an update to Attachment J-1-B, and an update to Attachment J-2-B.  All other terms and conditions remain unchanged.

------------

Solicitation N4523A20R1054 is being amended to N4523A20R1054_P00001.  This amendment updates and includes the Statement of Works for Attachment J-1-A AND Attachment J-1-B.  All other terms and conditions remain unchanged.

-----------

Attachment J-7 BAVR Instructions has been updated with the correct location information.  A new attachment has been included for this posting.  It is titled "Updated Attachment J-7 BAVR Instructions."  

-----------

The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), Bremerton, Washington intends to award a stand-along Firm-Fixed-Price contract to accomplish maintenance, repair, and preservation of the Yard Craft Barge 1591 (YC-1591) and Yard Craft Barge 1571 (YC-1571).

YC-1591 has the following specifications:

Built by: Orange Shipbuilding Co. INC

Length:  110 FT                Draft:  8 FT

Width:    32 FT - 0 IN        Light Displacement:  100 Tons

Age:       33 Years            Hull Type:  Steel

The contractor's facility must possess the capability of accomodating the YC-1591 with the dimensions as stated above.

Coordinate with the Contracting Officer, via the Contracting Officer's Representative (COR) to deliver the vessel to the Contractor's facility.  Upon docking vessel, was and clean vessel.  Replace Zincs.  Blast and Preserve Hull / Freeboard, Main Deck, and Tanks.  UT Hull / Freeboard and Main Deck.  Visual Inspection of Hull / Freeboard, Main Deck, and Tanks.  Replace hardware for tanks covers.  Replace covers for tanks.  Air test of tanks.  Undock the vessel.  Arrange and coordinate the delivery of the vessel back to the Government with the Contracting Officer via the COR.

YC-1571 has the following specifications:

Pointer-Williamette CO., Inc.

Length:  110 FT                                Draft:  8 FT

Width:   34 FT - 0 IN                         Full Displacement:  590 L Tons

Age:       73 Years                            Light Load:  160 L Tons

Hull Type:  Steel

Coordinate with the Contracting Offiver, via the Contracting Officer's Representative (COR) to deliver the vessel to the Contractor's facility.  Dock, wash, and clean the exterior surfaces of the vessel upon docking.  Blast and preserve Three tanks.  Visual inspect three tanks.  Undock the vessel.  Arrange and coordinate the deliver of the vessel back to the Government with the Contracting Officer via the COR.

The Period of Performance is scheduled to be:  17 March 2020 to 27 May 2020.

All offerors must be registered with the System for Award Management (SAM) to receive award of Government contracts.  Offerors are advised also that SAM representations and certifications can be completed electronically via the System for Award Management website at https://www.sam.gov.

Drawings for both the YC-1591 and YC-1571 are availabe upon request after 2 January 2020.

Contracting Officer Address:

Puge Sound Naval Shipyard Code 440 STOP 2026, 1400 Farragut, Bremerton, WA 98314-2026

Bid Protests Not Available

Similar Past Bids

Bremerton Washington 09 Jan 2020 at 5 PM
Bremerton Washington 27 Nov 2019 at 4 PM
Bremerton Washington 21 May 2019 at 9 PM
Bremerton Washington 26 Apr 2002 at 5 AM
Bremerton Washington 18 Jan 2023 at 5 PM

Similar Opportunities