Federal Bid

Last Updated on 01 Mar 2021 at 8 PM
Solicitation
Saint louis Missouri

Z1DA--Connect HVAC Components to BAS PN: 657-19-114JB,

Solicitation ID 36C25521R0053
Posted Date 01 Mar 2021 at 8 PM
Archive Date 15 Apr 2021 at 4 AM
NAICS Category
Product Service Code
Set Aside Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Contracting Office 255-Network Contract Office 15 (36c255)
Agency Department Of Veterans Affairs
Location Saint louis Missouri United states 63125

VA St. Louis Health Care System

Statement of Work: 657-19-114JB Connect Heating, Ventilation, & Air Conditioning to Building Automation System

6 November 2020

Purpose of Project:

The VA St. Louis Health Care System, Jefferson Barracks Division, needs to connect various HVAC systems the VA’s BAS system to improve healthcare, and access to healthcare, for Veteran’s.

Criteria:

All work shall be performed in accordance with solicitation/contract terms and conditions, specifications and drawings, and all applicable VA and local codes. Contractor shall furnish all supervision, tools, labor, materials, equipment, transportation and testing necessary. 

Scope of Work for this project shall include the following items:

Building 53:

  1. Pricing:
    1. Bid Item 1, Base Bid
      1. Contractor shall perform all work for 657-19-114JB Connect Heating, Ventilation, & Air Conditioning to Building Automation System at VAMC St. Louis Jefferson Barracks Division as fully described herein the contract documents. Period of Performance is 330 Calendar Days.
      2.  Bid Item 1 $________________
    2. Bid Item 2
      1. All items listed in Bid Item 1 Base Bid with the following modifications.  Remove Bldg 53 Demo of Existing Abandoned RHP, Piping, Removal and Replacement of the associated Fin Tube Control Valves, New DDC Thermostat, Power, and Networking. Qty 72 RHP & 32 associated Fin Tube Control Valves (remove Items C.2.c & C.2.d below). Period of Performance is 330 Calendar Days.
      2. Bid Item 2: $________________
    3. Bid Items 3
      1. All items listed in Bid Item 2 with the following modifications. Remove Bldg 53 upgrade of 12 Existing Pneumatic Duct Mounted Reheat Coil Control Valves to DDC Control (remove item C.2.a. below). Period of Performance is 330 Calendar Days. Period of Performance is 330 Calendar Days.
      2. Bid Item 3: $________________
  2. General Scope of Work
    1. Extension of the Existing VAMC Metasys Facility Management System to support the existing Mechanical and HVAC Systems in Building 53.
    2. Required Engineering, Hardware, Project Management, and programming for the DDC Control System shall be provided by contractor.
    3. Electrical Control Wiring for the Panels, Controllers, Devices, and controls Network is provided by contractor. 
    4. Existing Pneumatic Field Devices and Piping to be removed. 
      1. Existing Actuators, Temperature Sensors, Pressure Sensors, to be replaced with New Electronic/DDC Sensors and Actuators.
      2. Existing Pneumatic Control Valves to be replaced.  Mechanical Contractor to provide required labor, material, insulation, etc. to replace existing with New Valve.
      3. See Schedule below (Att. 1) for quantity and service on attached schedule.
    5. NO New Mechanical Equipment, Dampers, Fans, VFD’s are provided by contractor.
    6. Demolition and mechanical labor are provided by contractor.
    7. General trades labor to be included but not limited to the following:
      1. General clean up.
      2. Core drilling where required to run communications network.
      3. Ceiling removal and reinstallation.
      4. Cutting or patching existing wall sensor locations.  Cover plates to be installed by contractor.
    8. NO new control valves will be provided.
    9. Existing controls that are not operable or no longer needed (including thermostats) will be removed.
    10. Existing Systems which will not be modified under this scope of work include:
      1. 53-AH-1
      2. 53-AH-2
      3. 53-AH-3
      4. 53-AH-4
      5. 53-AH-5
      6. 53-AH-6
      7. 2nd Floor North VAV Boxes (Qty 28)
      8. 53- Hot Water System
      9. 53- Chilled Water System.
    11. Existing Systems which are NOT Currently Controlled and will NOT be modified under this scope of work include:
      1. Pneumatic Smoke Dampers (Addressed in Recent Fire Alarm Replacement Project)
      2. Emergency Generator Ventilation (Addressed in Generator Replacement)
      3. Hot Water Unit Heater Work (Stand Alone Electric Stat to remain)
      4. Elevator Exhaust Damper Replacement work
      5. Cabinet Unit Heaters (Qty 2) (Stand Alone Electric Stat to remain)
      6. Duct Mounted Humidifiers (Qty 1)

  1. System Specific Scope of Work:
    1. Furnishing Network Hardware as required for the addition of the DDC Controls provided under this project.  One NAE-55 will be provided.  The VAMC to identify Network Switch Location and contractor to run Network cabling as required to Network the New NAE to the VAMC System.
    2. Furnishing and installing DDC Controllers for the following:
      1. Duct Mounted Reheat Coils w/ Pneumatic Thermostats (Qty 12)
        1. Serving First and Second Floors Tagged RHC-1 thru RHC-12.
        2. Replace 3-Way Hot Water Control Valve
        3. Provide DDC Thermostat, Power, and Network
      2. VAV Terminal Units: (Qty 41)
        1. Existing pneumatic receiver Controller & Stat to be removed
        2. Existing pneumatic hot water reheat coil control valve to be replaced
        3. DDC controller, 24 VAC power, and network
        4. DDC thermostat
        5. Discharge air temperature sensor
        6. Volume control damper actuator & flow DPT
      3. HRP- Radiant Panel:
        1. VAMC disabled all existing HRP radiant ceiling panels
          • Any existing related pneumatic stats will be removed, and cover plates installed.
      4. Fin Tube Radiation: (Qty 40)
        1. Existing pneumatic stat to be removed
        2. Existing pneumatic hot water control valve to be replaced
        3. DDC controller, 24 VAC power, and network
        4. DDC thermostat
  2. Items not included:
    1. Installation of valves, wells, meters, or Taps.
    2. Installation of dampers or Air Flow Measuring Stations.
    3. Furnishing or installing starters, variable speed drives or disconnects for HVAC equipment
    4. Furnishing or installing Smoke Detection, Fire Alarm System, Fire/Smoke Damper Controls (by Div. 26)
    5. Systems testing & balancing
    6. Demolition, premium labor, cutting, patching, or painting
    7. Existing VFD Drives to Remain
    8. Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
    9. System Shutdowns will be Coordinated/Scheduled with the GC/Owner
    10. Contractor will reuse existing Field Device Wiring
    11. Contractor will reuse networking where possible.
    12. No work with Fire/Smoke Dampers

Building 3:

  1. General Scope of Work:
    1. Extension of the Existing VAMC Metasys Facility Management System to support the existing Mechanical and HVAC Systems in Building 3. 
    2. Required Engineering, Hardware, Project Management, and programming for the DDC Control System.
    3. Electrical Control Wiring for the Panels, Controllers, Devices, and automated controls Network. 
    4. Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
    5. NO New Mechanical Equipment, Dampers, Fans, VFD’s are provided by contractor.
    6. Demolition and mechanical labor shall be provided by contractor.
    7. General trades labor to be included by the contractor for the following:
      1. General clean up.
      2. Core drilling where required to run communications network.
      3. Ceiling removal and reinstallation.
      4. Cutting or patching existing wall sensor locations.  Cover plates to be installed by contractor.
    8. NO new control valves will be provided.
    9. Existing controls that are not operable or no longer needed (including thermostats) will be removed.

  1. System Specific Scope of Work:
    1. Furnishing network hardware as required for the addition of the DDC Controls provided under this project.  One NAE-55 will be provided.  The VAMC to identify Network Switch location and contractor to run network cabling as required to network the new NAE to the VAMC System.
    2. Furnishing and installing DDC controllers for the following:
      1. AHU-1 DDC controller upgrade and programming to include: (existing controller to be replaced to support the following field devices)
        1. Start/Stop
        2. Status
        3. OA-Damper Control
        4. HW Circulation Pump Start/Stop
        5. HW Circulation Pump Status
        6. Hot Water Valve Command
        7. Chilled Water Valve Command
        8. Filter Differential Pressure Sensor
        9. Supply Air Temperature Sensor
        10. Freeze Stat
        11. Chilled Water Supply Pressure
        12. Chilled Water Return Pressure
        13. Hot Water Supply Pressure
        14. Hot Water Return Pressure
      2. AHU-2, 3, 4, & 5 DDC CONTROLLER UPGRADE AND PROGRAMMING TO INCLUDE: (EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING FIELD DEVICES) (QTY 4)
        1. Start/Stop
        2. Status
        3. OA-Damper Control
        4. HW Circulation Pump Start/Stop
        5. HW Circulation Pump Status
        6. Hot Water Valve Command
        7. Chilled Water Valve Command
        8. Filter Differential Pressure Sensor
        9. Supply Air Temperature Sensor
        10. Freeze Stat
      3. Hot Water System - DDC CONTROLLER UPGRADE AND PROGRAMMING TO INCLUDE: (EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING FIELD DEVICES)
        1. Shared panel with chilled water system
        2. Relocate panel to avoid further heat and water damage.
        3. Hot Water Supply Pressure
        4. Hot Water Return Pressure
        5. Hot Water Distribution Pump Start/Stop (Qty 2)
        6. Hot Water Distribution Pump Status (Qty 2)
        7. Steam HX-A 1/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
        8. Steam HX-A 1/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
        9. Steam HX-B 2/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
        10. Steam HX-B 2/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
        11. Condensate Pump Start/Stop & Status (Qty 2)
      4. Chilled Water System - DDC CONTROLLER UPGRADE AND PROGRAMMING TO INCLUDE:(EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING FIELD DEVICES)
        1. Shared Panel with Chilled Water System
        2. Owner has requested Relocation outside of Mechanical Room due to Water and Heat Damage Potential
        3. Chilled Water Supply Temperature
        4. Chilled Water Return Temperature
        5. Primary Chilled Water Pump
        6. Chilled Water Distribution Pump VFD Control (Qty 2)
        7. Chiller Enable/Disable
        8. Chiller Status
        9. Chiller Alarm
        10. Chilled Water Setpoint Adjust
      5. Fan Coil Units – DDC Controller Upgrade and Programming to include: (Qty 66)
        1. TEC DDC Networked Thermostats (In Patient Rooms the DDC Thermostat will be mounted up in the Unit and a Tamper Proof Sensor will be located in the space)
        2. Existing FCU to be Controlled by New TEC:  This includes:
          1. Chilled Water Coil Control Valve
          2. Hot Water Coil Control Valve
          3. Fan Control

  1. Items not included:
    1. Installation of valves, wells, meters, or Taps.
    2. Installation of dampers or Air Flow Measuring Stations.
    3. Furnishing or installing starters, variable speed drives or disconnects for HVAC equipment
    4. Furnishing or installing Smoke Detection, Fire Alarm System, Fire/Smoke Damper Controls (by Div. 26)
    5. Systems testing & balancing
    6. Demolition, premium labor, cutting, patching, or painting
    7. Existing VFD Drives to Remain
    8. Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
    9. System Shutdowns will be Coordinated/Scheduled with the GC/Owner
    10. Contractor will reuse existing Field Device Wiring
    11. Contractor will reuse networking where possible.
    12. No work with Fire/Smoke Dampers

Attachment 1: Building 53 HVAC Components

General Location Served

ID

TAG

Valve GPM

Note

First Floor Center/South

RHC

1

1

Pneumatic Stat & Valve Replaced w/ DDC

First Floor Center/South

RHC

2

1.5

Pneumatic Stat & Valve Replaced w/ DDC

First Floor Center/South

RHC

3

0.5

Pneumatic Stat & Valve Replaced w/ DDC

First Floor North

RHC

4

?

Pneumatic Stat & Valve Replaced w/ DDC

First Floor North

RHC

5

1.5

Pneumatic Stat & Valve Replaced w/ DDC

First Floor North

RHC

6

1.5

Pneumatic Stat & Valve Replaced w/ DDC

Second Floor Center/South

RHC

7

1.5

Pneumatic Stat & Valve Replaced w/ DDC

Second Floor Center/South

RHC

8

0.5

Pneumatic Stat & Valve Replaced w/ DDC

Second Floor Center/South

RHC

9

2.5

Pneumatic Stat & Valve Replaced w/ DDC

Second Floor Center/South

RHC

10

1.5

Pneumatic Stat & Valve Replaced w/ DDC

Second Floor Center/South

RHC

11

0.5

Pneumatic Stat & Valve Replaced w/ DDC

Second Floor Center/South

RHC

12

1

Pneumatic Stat & Valve Replaced w/ DDC

Tot 12

Ground Floor Center/South

VAV

1

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

2

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

3

2.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

4

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

5

2

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

6

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

7

0.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

8

1

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

9

No VLV

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

10

3.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

11

0.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

12

3.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

13

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

14

2

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

61

No VLV

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

62

No VLV

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

63

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

64

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

65

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor Center/South

VAV

66

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor North

VAV

15

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor North

VAV

16

1

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor North

VAV

17

0.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor North

VAV

18

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor North

VAV

19

2.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor North

VAV

20

2

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor North

VAV

21

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Ground Floor North

VAV

22

0.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Tot 28

First Floor Center/South

VAV

23

No VLV

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor Center/South

VAV

24

1.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor Center/South

VAV

25

1

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor Center/South

VAV

26

3.5

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor Center/South

VAV

27

No VLV

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor Center/South

VAV

28

No VLV

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor Center/South

VAV

29

No VLV

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor Center/South

VAV

30

6

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor Center/South

VAV

31

1

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor Center/South

VAV

32

No VLV

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor Center/South

VAV

67

1

 Pneumatic Stat/Controller & Vlv & FTR Vlv Replaced w/ DDC

First Floor North

VAV

33

1

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor North

VAV

34

1

Pneumatic Stat/Controller & Valve Replaced w/ DDC

First Floor North

VAV

35

1

Pneumatic Stat/Controller & Valve Replaced w/ DDC

Tot 13

Second Floor Center/South

VAV

36

2

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

37

2

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

38

1

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

39

1.5

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

40

1.5

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

41

2

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

42

1.5

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

43

1.5

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

44

1

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

45

0.5

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

46

0.5

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

47

1.5

New DDC 2008 - No Work Required

Second Floor Center/South

VAV

60

1

New DDC 2008 - No Work Required

Second Floor North

VAV

48

1.5

New DDC 2008 - No Work Required

Second Floor North

VAV

49

1.5

New DDC 2008 - No Work Required

Second Floor North

VAV

50

0.5

New DDC 2008 - No Work Required

Second Floor North

VAV

51

1

New DDC 2008 - No Work Required

Second Floor North

VAV

52

2.5

New DDC 2008 - No Work Required

Second Floor North

VAV

53

2.5

New DDC 2008 - No Work Required

Second Floor North

VAV

54

3.5

New DDC 2008 - No Work Required

Second Floor North

VAV

55

3.5

New DDC 2008 - No Work Required

Second Floor North

VAV

56

1.5

New DDC 2008 - No Work Required

Second Floor North

VAV

57

1.5

New DDC 2008 - No Work Required

Second Floor North

VAV

58

3.5

New DDC 2008 - No Work Required

Second Floor North

VAV

59

3.5

New DDC 2008 - No Work Required

First Floor North

HRP

1N99

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1N96

2.3

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1N95

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1N100

3

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1N92

0.8

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1N90

0.8

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1N82

1.5

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1N86

0.8

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1N83

1.5

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1N85

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1N106

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1N113

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1N107

1.5

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1N112

1.5

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1N109

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1N110

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1N79

0.8

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1N77

1.5

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S01

1.5

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S13

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1S16

2.3

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S65

1.5

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S63

0.8

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S24

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1S31

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1S25

1.5

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S30

1.5

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S27

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1S28

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1S58

1.5

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S54

0.8

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S55

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1S57

1.5

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S51

0.8

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S50

1

Ower Disabled/Abandoned - Remove as required. 

First Floor North

HRP

1S41

3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1S46

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1S42

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

First Floor North

HRP

1S45

2.3

Ower Disabled/Abandoned - Remove as required. 

Second Floor North

HRP

2N87

1.5

Removed '08 - No Work Required

Second Floor North

HRP

2N104

1.5

Removed '08 - No Work Required

Second Floor North

HRP

2N86

2.3

Removed '08 - No Work Required

Second Floor North

HRP

2N106

2.3

Removed '08 - No Work Required

Second Floor South

HRP

2S85

1.5

Removed '08 - No Work Required

Second Floor South

HRP

2S01

1.5

Removed '08 - No Work Required

Second Floor South

HRP

2S03

1.5

Removed '08 - No Work Required

Second Floor South

HRP

2S83

3

Removed '08 - No Work Required

Second Floor South

HRP

2S82

1.5

Removed '08 - No Work Required

Second Floor South

HRP

2S80

1.5

Removed '08 - No Work Required

Second Floor South

HRP

2S77

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S25

3.8

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S76

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S28

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S73

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S72

3.8

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S68

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S66

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S41

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S40

2.3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S43

1.5

Ower Disabled/Abandoned - Remove as required. 

Second Floor South

HRP

2S38

1.5

Ower Disabled/Abandoned - Remove as required. 

Second Floor South

HRP

2S44

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S37

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S65

1.5

Ower Disabled/Abandoned - Remove as required. 

Second Floor South

HRP

2S70

0.8

Ower Disabled/Abandoned - Remove as required. 

Second Floor South

HRP

2S64

0.6

Ower Disabled/Abandoned - Remove as required. 

Second Floor South

HRP

2S61

1.5

Ower Disabled/Abandoned - Remove as required. 

Second Floor South

HRP

2S62

1.5

Ower Disabled/Abandoned - Remove as required. 

Second Floor South

HRP

2S63

0.8

Ower Disabled/Abandoned - Remove as required. 

Second Floor South

HRP

2S53

3.8

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S58

1.5

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S54

3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Second Floor South

HRP

2S57

3

Ower Disabled/Abandoned - Remove as required.  New DDC for  associated FTR

Bid Protests Not Available