The purpose of this solicitation amendment is to answer vendor questions, provide additional pictures for reference, and provide a change to the PWS. Section 4 will now reference 55 LF instead of 70 LF. What is the elevation height of the gable on the building? Elevation is approximately 33 from ground x 55 wide. Is there any flower beds, shrubs, or obstruction at ground level below the gable? Fire escape and loading dock ramp. Are site conditions for equipment asphalt, or solid ground. Or is it soil that is soft,  If so, will there need to be ground protection for equipment such as manlifts, etc.? Area is a grass area and may need to have ground protection depending on rain. When will the description for the existing coating to matching existing profile be given for fascia sheet metal coat? Exterior finish needs to match existing profile and color (currently white sheet metal and roof is copper sheet metal). Mary Jane Crim