Point Of Contact Not Available
BIDS DUE: Oct 19th @ 12:00 PM (EST) Subcontractors are to review ALL Drawings, Surveys, Specs and (if applicable) RFIs & Addenda. Subcontractor must acknowledge this on their proposal. GENERAL SCOPE OF WORK:Tenant build out of a Family dollar store. This scope of work includes Demolition, rough carpentry, millwork, finish carpentry, FRP, metals, frames and hardware, drywall, flooring, painting, ACT, wallcovering, electrical, HVAC, plumbing, fire alarm, fire protection. please be sure to review all plans surveys, specs, addenda and/or RFIs. PROJECT DATES: TRADES INCLUDE: 01: Temp Toilets, Final Cleaning, Waste Removal; 02: Demolition 03: Concrete Flatwork; 04: Masonry; 05: Metal, Structural steel; 06: Millwork, FRP, Rough Carpentry, Finish Carpentry; 07: Roofing; 08:Doors, Frames and Hardware, Glass & Glazing; 09: Carpet, ACT, Drywall, Paint, Wall Covering; 10: Wall Protection; 21: Fire suppression; 22: Plumbing; 23: HVAC, Test & Balance; 26: Electrical, Fire alarm
Bid Protests Not Available