Point Of Contact Not Available
**Addendum # 2 is posted on 2/21, this changes due date to 2/26/19.****Addendum #1 is posted on 2/14/2019 - does not change due date** Removal and replacement of pool dehumidifier at Martin Luther King Jr. Pool. Documents posted include: 1) Project Manual; 2) Dehumidifier Specification 23 84 16; 3) Partnering Specification 4) Local Hire Forms. There are no drawings associated with this project. Attendance at the pre-bid conference is highly encouraged.
Bid Protests Not Available