The project includes, but is not limited to, extending East Maryland Ave. with a two lane road with adjacent bike lanes, curb and gutter, and sidewalk as well as constructing a storm sewer and drainage system. The major items of work include, but are not limited to 1,070 L.F. of roadway construction including 7,500 C.Y. of embankment construction, 1,340 C.Y. of unclassified excavation, 1,580 tons of aggregate base course, 1,510 tons of ACHM surface and binder course, 500 L.F. of sanitary sewer relocation, 500 L.F. of R.C. pipe, a quintuple 8’x4’ R.C. box culvert, 1,200 S.Y. of sidewalk, and 2,030 L.F. of curb and gutter as shown on the plans and indicated in the specifications.