Point Of Contact Not Available
BIDS DUE: October 21, 2021 @ 05:00pm (EST) Subcontractors are to review ALL Drawings, Spec’s and (if applicable) RFI’s & Addendum’s. Subcontractor must acknowledge this on their proposal. GENERAL SCOPE OF WORK: Remodeling existing space to a Dollar Tree store. This scope of work includes demolition of all interiors and existing storefront doors, creating an opening in the wall for new storefront. Fire alarm and Fire protection. All fixturing's(gondolas, cash registers, signage, etc.) will be provided by Dollar Tree for installation. New RTU's, light fixtures, etc. will also be Dollar Tree provided. Please be sure to review all Plans (dated 10/01/2021), Specs, Surveys and Photos. PROJECT DATES: Approx. start 11/15/2021 (6-week schedule) TRADES INCLUDE: 01: Temp Toilets, Final cleaning, Waste Removal; 02: Demo; 03: Concrete Repair; 04: Masonry; 05: Structural Steel, Metal; 06: Millwork, FRP, Rough Carpentry, Finish Carpentry; 07: Roofing; 08:Doors, Frames and Hardware, Glass & Glazing; 09: Flooring – VCT, Drywall, Paint, Wall Covering; 21: Fire Suppression; 22: Plumbing, Gas Piping; 23: HVAC, Test & Balance, EMS Commissioning; 26: Electrical, Lighting, Fire Alarm;
Bid Protests Not Available